Skip to Main Content

Apply Now to the University of Wyoming apply now

Check Out Construction of EERB Via Live Webcam

January 26, 2017
Screen shot of EERB live webcam
The EERB construction progress can be viewed via a GE Johnson webcam.

An online feature now is available for those interested in the progress of construction on the Engineering Education and Research Building (EERB) at the University of Wyoming.

A webcam has been provided by GE Johnson Construction, the building’s construction manager. It can be accessed here.

Features of the site include a live camera view, a time-lapse slideshow, photo album and project information. This new engineering facility is located on the north end of the UW campus near 11th and Lewis streets, across Lewis from the existing Engineering Building. It is expected to be completed in spring/summer of 2019.

1000 E. University Ave. Laramie, WY 82071
UW Operators (307) 766-1121 | Contact Us | Download Adobe Reader

Accreditation | Virtual Tour | Emergency Preparedness | Employment at UW | Privacy Policy | Harassment & Discrimination | Accessibility Accessibility information icon