QUESTION:

My building is under construction and is scheduled to have power, heat, and water outages for part of one day to complete work while students are out on break.  During this time, my supervisor has advised me not to report to work.  Do I need to report at my normal office, elsewhere on campus, or should I do as my supervisor has advised and not report until power/heat/water are restored? 

ANSWER:

Human Resources does not have a specific policy regarding reporting for work when construction affects the normal operation of a building.  In general, if some normal job functions can be completed and the building does not become too hot or cold (which would then be an EHS matter), employees should follow their normal routine to the extent possible. If employees are unable to perform key job functions due to the power/heat/water outages, then they should discuss a reasonable accommodation with their supervisors that takes into account the type of work being performed and whether and how students will be affected. 

Contact Us

UW Staff Senate

Merica Hall, Room 320

1000 E. University Ave.

Dept. 3413

Laramie, WY 82071

Phone: (307) 766-5300

Email: staffsen@uwyo.edu

Staff Senate at the University of Wyoming Logo
Find us on Facebook (Link opens a new window)

1000 E. University Ave. Laramie, WY 82071
UW Operators (307) 766-1121 | Contact Us | Download Adobe Reader

Accreditation | Virtual Tour | Emergency Preparedness | Employment at UW | Privacy Policy | Harassment & Discrimination | Accessibility Accessibility information icon