Half Acre Recreation and Wellness Center (All City Floor Company, Denver, Colo.) -- The contractor will refinish the floors in Half Acre. Work is scheduled Dec. 18-23.  

College of Business (Arcon Inc., Laramie) -- Installation of new windows on the third floor is ongoing. Use caution in the area, as it will be partially blocked off for demolition on the walls and for adding new sprinklers.

White Hall (Commercial Flooring, Cheyenne) -- Work to install blinds in the “fishbowl” areas of each floor will begin the week of Dec. 18 and continue into January. Please use caution around the area and equipment.

River Village Apartments (UW Operations, Equipment and Plumbing Shops; February 2018) -- Operations to replace existing heating system expansion tanks with new tanks and vents will be ongoing in mechanical rooms, as weather permits. Please use caution around crews and equipment.

Central Energy Plant (Arcon Inc., Laramie; December 2017) -- Construction fence is set up around the work area. The sidewalk on the west side of 19th Street is closed, and 19th Street will be blocked occasionally. Please be cautious of crews and equipment in the area.

Engineering Education and Research Building (EERB) (Construction manager GE Johnson Construction Wyoming LLC, Casper; spring 2019) -- Miscellaneous steel detailing remains. Concrete on the metal deck is complete, and associated topping slabs are 90 percent complete. Concrete block is being placed to form the pilasters around the building. Exterior and interior metal stud framing and exterior sheathing are underway. Mechanical/electrical/plumbing rough-ins are underway. Roofing is underway. Please steer clear of heavy equipment or delivery trucks parked on city streets. Click here to see a map showing revisions to bus routes and street closures. Please observe all construction signs.

Mick and Susie McMurry High Altitude Performance Center (Construction manager at risk GE Johnson Construction Wyoming LLC, Jackson; June 2018) -- Exterior veneer is complete, except for the new north entry additions and final paving/landscape improvements. Drywall hanging/finishing, painting, tile and all other interior finishes are in progress. Please use caution when near the project, and observe all construction signs. 

Agriculture C and Engineering Addition Buildings (Summit Sealants, Montrose, Colo.; July 2018) -- Painting, caulking and minor repairs to the exteriors of Agriculture and Engineering will be ongoing through the winter, as weather permits.  

Cooper House (Stonewood Design & Construction, Laramie; December 2017) -- Reconstruction of the south-side outdoor patio columns will be completed to repair deterioration. Staging will be in the southeast corner of the parking lot by the landscape dumpster and driveway off of Grand Avenue. Please use caution, and observe signs around the construction area.

White Hall (UW Operations Shops; June 2018) -- Phase I modifications to the north- and south-side exit stairwells, to prevent cold-weather freezing in the soffits, will occur. Each stairwell will be closed at grade level for two days to prevent demolition dust nuisance in core drill phases. Please use the opposite stairwell or elevator when signs are posted. Outside soffit louvers will be removed, blocked and refinished next spring, as weather allows. Please use caution, and observe signs around the construction area.

The following projects are complete:

Education Building, Ed Ag Lab (Trident Electric; December 2017) -- Work to install ventilation units and electrical connection upgrades for welding units is complete.

Campuswide Fall Roof Cleaning (UW Equipment Shop; Flynn Southwest, Brighton, Colo.; Big Horn Roofing, Laramie) -- Cleaning of gutters and downspouts is complete for the season.

 

 

Contact Us

Institutional Communications
Bureau of Mines Building, Room 137
Laramie, WY 82071
Phone: (307) 766-2929
Email: cbaldwin@uwyo.edu


Find us on Facebook (Link opens a new window) Find us on Twitter (Link opens a new window)