IECM 12.0 beta User Manual > Modules Included with the IECM > Pulverized Coal (PC) Plant > CONFIGURE SESSION > Plant Design > Predefined Configurations > Typical New Plant |
|
The Typical New Plant configuration is intended to meet the EPA's New Source Performance Standards (NSPS) requirements:
•Coal/Biomass
•In-Furnace Controls (See In-Furnace Controls parameters and In-Furnace Controls results for more details.)
•Hot-Side SCR (See Hot-Side SCR parameters and Hot-Side SCR results for more details.)
•Cold-Side ESP (See Cold-Side ESP parameters and Cold-Side ESP results for more details.)
•Wet FGD (See Wet FGD parameters and Wet FGD results for more details.)
•Wet Cooling Tower (See Wet Cooling Tower or Wet Unit parameters and Wet Cooling Tower or Wet Unit results for more details.)
•Ash Pond (See By-Product Management parameters for more details.)
•No Mixing
Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/