See Retrofit or Adjustment Factor Inputs for an explanation of retrofit costs. The wet FGD system has the following capital cost process areas:
•Reagent Feed System: This area includes all equipment for storage, handling and preparation of raw materials, reagents, and additives used.
•SO2 Removal System: This area deals with the cost of equipment for SO2 scrubbing, such as absorption tower, recirculation pumps, and other equipment.
•Flue Gas System: This area treats the cost of the duct work and fans required for flue gas distribution to SO2 system, plus gas reheat equipment.
•Solids Handling System: This area includes the cost of the equipment for fixation, treatment, and transportation of all sludge/dry solids materials produced by scrubbing.
•General Support Area: The cost associated with the equipment required to support FGD system operation such as makeup water and instrument air are treated here.
•Miscellaneous Equipment: Any miscellaneous equipment is treated in this process area.