IECM 12.0 beta User Manual > Modules Included with the IECM > Pulverized Coal (PC) Plant > SET PARAMETERS > CO2 Capture, Transport & Storage > 1. Amine System > Fixed O&M Cost |
|
This is a standard O&M cost input screen which contains inputs for the amine system's fixed O&M costs in PC and NGCC plants. (Variable O&M costs are on the previous screen .)
Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/