IECM 12.0 beta User Manual > Modules Included with the IECM > Pulverized Coal (PC) Plant > GET RESULTS > SO2 Control > Wet FGD >

O&M Cost

 

← Previous | Next → 

 

This is a standard O&M cost result screen. The Wet FGD has the following variable cost components:

Reagent: The total mass flow rate of lime or limestone injected into the scrubber on a wet basis. This is a function of the SO2 concentration in the flue gas and the Reagent Stoichiometry .

Dibasic Acid: (Only shown when LS w/ Additives is chosen as the reagent .) This is the cost of dibasic acid (DBA) used for the wet FGD.

Solid Waste Disposal: Total cost to dispose of the collected flue gas waste solids. This does not consider by-product gypsum sold in commerce.

Electricity: Cost of power consumption of the scrubber. This is a function of the gross plant capacity and the Wet FGD Power Requirement performance parameter .

Water: Cost of water for reagent sluice in the scrubber. This is a function of the Liquid to Gas Ratio performance parameter . The cost is a function of the flue gas flow rate and the reagent chosen on the Config screen.