The mechanical Wastewater Treatment result screen is only shown when mechanical wastewater treatment is configured:


PC: GET RESULTS: By-Product Management: Wastewater Treatment (Mechanical)

Each result is described briefly below:

Wastewater Treatment Inputs

Area 1: Wastewater In: This is the water flow rate into the wastewater treatment system.

Wastewater Treatment Totals

Area 2: Evaporation: This is the amount of water evaporated from the wastewater treatment system.

Area 3: Brine: This is the flow rate of brine from the wastewater treatment system.