IECM 12.0 beta User Manual > Modules Included with the IECM > Natural Gas Combined Cycle (NGCC) Plant > SET PARAMETERS > Power Block > O&M Cost |
|
Inputs for the operation and maintenance costs of the power block are entered on the O&M Cost parameter screen. This screen is shown for both NGCC and IGCC plants. The following input is included at the top of the screen:
•Water Cost: (Only shown for NGCC) This is the unit cost of water.
The remainder of the screen consists of our standard O&M Cost inputs.