Inputs for the operation and maintenance costs of the power block are entered on the O&M Cost parameter screen. This screen is shown for both NGCC and IGCC plants. The following input is included at the top of the screen:

Water Cost: (Only shown for NGCC) This is the unit cost of water.

The remainder of the screen consists of our standard O&M Cost inputs.