IECM 12.0 beta User Manual > Modules Included with the IECM > Integrated Gasification Combined Cycle (IGCC) Plant > SET PARAMETERS > CO2 Capture, Transport & Storage > 1. Water Gas Shift Reactor > O&M Cost |
|
This is an O&M Cost Input Screen with the following additional inputs for the water gas shift reactor (WGSR) at the top of the screen:
•High Temperature Catalyst Cost: This is the unit cost of the iron-based high temperature catalyst.
•Low Temperature Catalyst Cost: This is the unit cost of the copper-based low temperature catalyst.
•Water Cost: This is unit cost of water used to drive the water gas shift reaction.
Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/