This is an O&M Cost Input Screen with the following additional inputs for the Selexol CO2 capture system at the top of the screen:
•Bulk Reagent Storage Time: This is the reagent stored at the plant.
•Glycol Cost: This is the unit cost for glycol that is used by the Selexol CO2 capture system.
•Waste Disposal Cost: This is the cost of disposing the water that is used in the Selexol CO2 capture process.
The following additional inputs are provided at the bottom of the screen:
•Transport and Storage Costs:
•CO2 Transportation Cost: This is the cost of moving the CO2 (i.e., pipeline, truck) to the place where it will be sequestered.
•CO2 Disposal Cost: This is the cost of sequestering the CO2.