IECM 12.0 beta User Manual > Modules Included with the IECM > Integrated Gasification Combined Cycle (IGCC) Plant > GET RESULTS > Air Separation Unit > O&M Cost |
|
This is a standard O&M cost result screen. It is available for IGCC plants and PC Oxyfuel plants.
The air separation unit has the following variable cost component:
•Electricity: The cost of electricity consumed by the Air Separation System.
Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/