IECM 14.0 beta User Manual
IECM 14.0 beta User Manual

 

The parameters on the Financing parameter screen define the financial and economic assumptions used to estimate the cost of hydrogen pipeline transport. The following parameters are available:

•Discount Rate: This is also known as the cost of money. Discount rate (before taxes) is equal to the sum of return on debt plus return on equity, and is the time value of money used in before-tax present worth arithmetic (i.e., levelization).

•Pipeline Life: This is the assumed lifetime of the pipeline.

•Compressor Life: This is the assumed book lifetime of the compressor equipment.


Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/