|
IECM 14.0 beta User Manual > Modules Included with the IECM > Low-Carbon Hydrogen Production & Transport > GET RESULTS > Hydrogen Purification > Pressure Swing Adsorption > Capital Cost (TPC) |
|
The Capital Cost results of the hydrogen purification area are divided into two screens. The second screen, Capital Cost (TPC), shows the Total Plant Cost (TPC) results for the hydrogen purification area, as described in Hydrogen Production Capital Cost (TPC).
Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/