Campus Construction Update for Sept. 17

(Note: The weekly construction update highlights only projects with new developments. Comprehensive updates are distributed monthly. For the most recent comprehensive update, click here.)

These are among the construction activities scheduled Sept. 17-23 at the University of Wyoming:

Arena-Auditorium Addition and Renovations (General contractor Sletten Construction of Wyoming Inc., Cody; October 2017) -- Parking on the east side of the building will be blocked for the project duration. Access to the A-A is closed. Be cautious of equipment, vehicles and construction crews in the area.

Spanish Walk Apartments (Arcon Inc. and Lance’s Painting, Laramie; September 2017) -- These buildings will undergo exterior renovation. Please use caution in the area. To ensure privacy, keep blinds closed.

Engineering Education and Research Building (EERB) (Construction manager GE Johnson Construction Wyoming LLC, Casper; spring 2019) -- Structural steel erection is complete, and miscellaneous detailing remains. Concrete on the metal deck and associated topping slabs will continue for the next few weeks. Concrete block is being placed to form the pilasters around the building. Exterior and interior metal stud framing is underway. Mechanical rough-in will start over the next month. Please steer clear of heavy equipment or delivery trucks parked on city streets. Click here to see a map showing revisions to bus routes and street closures. Please observe all construction signs. GE Johnson will be doing an emergency response drill next Tuesday.

Mick and Susie McMurry High Altitude Performance Center (Construction manager at risk GE Johnson Construction Wyoming LLC, Jackson; June 2018) -- Gates 6 and 8, and access across the north side of the field are open and fully restored. All other pedestrian access routes are indicated by traffic-control barricades and signs. Site flatwork and paving are in progress, and barricades will be in place for new concrete pours. Please use caution when near the project, and observe all construction signs.

The following projects are complete:

Michael B. Enzi STEM Facility (UW Operations) -- Building electric shutdown testing was conducted and completed Saturday, Sept. 9.

Physical Sciences Building, Rooms 338 and 336 (Colorado Hazard Control, Denver; September 2017) -- Abatement activities in preparation for the lab renovation are complete. 

 

 
Contact Us

Institutional Communications

Bureau of Mines Building, Room 137

Laramie

Laramie, WY 82071

Phone: (307) 766-2929

Email: cbaldwin@uwyo.edu

Find us on Instagram (Link opens a new window)Find us on Facebook (Link opens a new window)Find us on Twitter (Link opens a new window)Find us on LinkedIn (Link opens a new window)Find us on YouTube (Link opens a new window)