IECM 12.0 beta User Manual
IECM 12.0 beta User Manual

IECM 12.0 beta User Manual > Modules Included with the IECM > Pulverized Coal (PC) Plant > GET RESULTS > Overall Plant >

Total Capital Cost

 

← Previous | Next → 

 

The Total Capital Cost result screen consists of two tables.

The table on the left contains the Process Facilities Capital (PFC) for each technology. The technologies (rows) are described in more detail in the next section, Overall Plant Cost.

The table on the right contains the standard capital cost results for the entire plant.


Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/