Inputs for operation and maintenance of the pipeline transport system for all plant types are entered on the O&M Cost parameter screen. O&M costs are typically expressed on an average annual basis and are provided in either constant or current dollars for a specified year, as shown in the Status Bar. Each parameter is described briefly below:
•Booster Pump Operating Cost: This is the cost of operating a booster pump as a percent of the process facilities capital.
•Fixed O&M Cost: These are the operating and maintenance fixed costs including all maintenance materials and all labor costs and is given in dollars per mile of pipeline per year.