Parameters related to the Operations Cost of the CO2 storage system are entered on this parameter screen. The following parameters are provided:

Operation Duration: This is the number of years of operation.

Contingency Factor: This is the operation process contingency factor.

Geophysical Survey: 3D Seismic: This is the cost of 3D seismic monitoring.

Labor Rates: These are the labor rates for the personnel associated with the reservoir:

Geologist

Engineer

Landman

Miscellaneous Operations: This is a miscellaneous operations cost, expressed as a percentage of the annual operations cost (based on the net present value). The total operations cost is the sum of the two.