Parameters related to the Post-injection Cost of the CO2 storage system are entered on this parameter screen. The following parameters are provided:

PISC and Site Closure Duration: This is the number or years required for post-injection site care (PISC) and site closure.

Well Seismic: VSP Tool Costs: This is the cost of vertical seismic profile (VSP) tools.

Miscellaneous PISC and Site Closure: This is a miscellaneous PISC and site closure cost, expressed as a percentage of the annualized PISC and site closure cost (based on the net present value). The total annualized PISC and site closure cost is the sum of the two.