IECM 12.0 beta User Manual > Modules Included with the IECM > Pulverized Coal (PC) Plant > SET PARAMETERS > By-Product Management > Wastewater Treatment Performance |
|
Performance inputs related to wastewater are entered on the Wastewater Treatment Performance parameter screen. The following parameters are available:
•Fireside Cleaning Wastewater: This is the fireside washing wastewater volume rate.
•Air Preheater Cleaning Wastewater: This is the air preheater cleaning wastewater volume rate.
•Floor & Yard Drain Wastewater: This is the floor and yard drain wastewater volume rate.
•Average Annual Rainfall: This is the average yearly rainfall. It is used in calculating the amount of runoff from the coal pile.
•Coal Pile Height: This is the height of the coal pile. It is used in calculating the amount of runoff from the coal pile.
Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/