The Post-injection Cost screen shows the post-injection costs associated with the CO2 storage system for all plant types in a single table format . The following costs are shown:

•Geophysical Survey: 3D Seismic: This is the annual cost of 3D seismic monitoring.

•Fluid & Gas Samples: This is the annual cost of fluid and gas samples.

•Plug & Abandon: This is the annual cost of removing equipment and restoring the site.

•Miscellaneous Site Closure Costs: These are additional miscellaneous site closure costs.

•Periodic Reports: This is the annual cost of periodic reports.

•Total Post-injection Cost: This is the sum of the costs listed above. It is highlighted in yellow.