This is a standard O&M cost result screen. It is shown for all plant types. The wet cooling tower has the following variable cost components:
•Alum: This is the cost of alum used for makeup water treatment.
•Disposal: Total cost to dispose the collected tower waste solids and wastewater.
•Electricity: Cost of power consumption of the scrubber. This is a function of the gross plant capacity and the cooling system power requirement performance input parameter .
•Water: This is the annual cost of the water used by the cooling system.