This is a standard capital cost result screen. It is shown for all plant types.

The wet cooling tower has the following process area costs:

Cooling Tower Structure: This area deals with the cost for the cooling tower and installation.

Circulation Pumps: This area deals with the cost for the circulating cooling water pumps.

Auxiliary Systems: This area deals with the cost for a closed-loop process that utilizes a higher quality water to remove heat from ancillary equipment and transfers that heat to the main circulating cooling water system.

Piping: This area deals with the cost for the circuiting cooling water piping.

Makeup Water System: This area deals with the cost for the capital equipment to provide makeup water for the cooling system.

Cooling Water System: This area deals with the cost for the component cooling water system.

Foundation & Structures: This area deals with the cost for the circulating water system foundation and structures.