IECM 12.0 beta User Manual
IECM 12.0 beta User Manual

 

This is a standard O&M cost result screen. It is available for both the NGCC and IGCC plant types.

The power block has the following variable cost components:

Natural Gas: (Only shown for NGCC plants.) The total cost of natural gas used by the power block.

Internal Electricity Cost: Power consumed by abatement technologies results in lower net power produced and lost revenue. The IECM charges each technology for the internal use of electricity and treats the charge as a credit for the base plant. When comparing individual components of the plant, these utility charges are taken into consideration. For total plant costs they balance out and have no net effect on the plant O&M costs.