|
IECM 13.0 User Manual > Modules Included with the IECM > Natural Gas Combined Cycle (NGCC) Plant > GET RESULTS > Power Block > Total Cost |
|
This is a standard Total Cost result table. It is available for both the NGCC and IGCC plant types.
Copyright © 2022-2025 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/