IECM 14.0 beta User Manual
IECM 14.0 beta User Manual

 

The Capital Cost results of the natural gas reforming area are divided into two screens. The second screen, Capital Cost (TPC), shows the Total Plant Cost (TPC) results for the reforming area, as described in Hydrogen Production Capital Cost (TPC).


Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/