The Capital Cost results of the natural gas reforming area are divided into two screens. This first screen, Capital Cost (BEC), presents the Bare Erected Cost (BEC) results. A single table displays the equipment included in the natural gas reforming area:

•Natural Gas Pipeline & Start-Up System: This is the BEC for the natural gas pipeline and the associated start-up system for the natural gas reforming area.

•Air Blower: This is the BEC for the air blower used for the natural gas reforming area.

•Sulfur Guard Bed: This is the BEC for the sulfur guard used for the natural gas reforming area.

•Pre-Reformer: This is the BEC for the pre-reformer used for the natural gas reforming area.

•Primary Reformer: This is the BEC for the primary reformer used in the natural gas reforming area.

•Misc. Plant Equipment: This is the BEC for Miscellaneous Plant Equipment used for the natural gas reforming area.

•Bare Erected Cost: This is the total of all technologies listed above. This result is highlighted in yellow.