|
IECM 14.0 beta User Manual > Modules Included with the IECM > Low-Carbon Hydrogen Production & Transport > GET RESULTS > Syngas Cleanup > Water Gas Shift + MDEA > Variable O&M Cost |
|
The Variable O&M Cost screen shows the variable O&M costs for the syngas cleanup area in a single-table format:
•Process Makeup Water: This is the water cost for the syngas cleanup area.
•Electricity: This is the electricity cost for the syngas cleanup area.
•MDEA Solution: This is the cost of the MDEA solution used in the syngas cleanup area.
•Water Gas Shift Catalyst: This is the cost of the water gas shift catalyst used in the syngas cleanup area.
•MDEA Waste Disposal: This is the disposal cost for the MDEA solution.
•Water Gas Shift Catalyst Disposal: This is the disposal cost for the water gas shift catalyst.
•Non-Fuel Variable O&M Cost: This is the total of all components listed above. It is highlighted in yellow.
Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/