The Capital Cost results for the water system are divided into two screens. This first screen, Capital Cost (BEC), presents the Bare Erected Cost (BEC) results. A single table displays the equipment included in the water system:

•Feedwater System: This is the BEC of the feedwater system.

•Cooling Tower: This is the BEC of the cooling tower.

•Bare Erected Cost: This is the total of all technologies listed above. This result is highlighted in yellow.