|
IECM 14.0 beta User Manual > Modules Included with the IECM > Low-Carbon Hydrogen Production & Transport > GET RESULTS > Water System > Capital Cost (BEC) |
|
The Capital Cost results for the water system are divided into two screens. This first screen, Capital Cost (BEC), presents the Bare Erected Cost (BEC) results. A single table displays the equipment included in the water system:
•Feedwater System: This is the BEC of the feedwater system.
•Cooling Tower: This is the BEC of the cooling tower.
•Bare Erected Cost: This is the total of all technologies listed above. This result is highlighted in yellow.
Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/