IECM 12.0 beta User Manual
IECM 12.0 beta User Manual

IECM 12.0 beta User Manual > A Case Study > Get Results > Overall Plant >

Performance Summary

 

← Previous | Next → 

 

Click Plant Performance, the second screen under Overall Plant. It displays performance results for the plant as a whole. Values for the major inputs and outputs of the power plant are given. The screen should look like this:


GET RESULTS: Overall Plant: Plant Performance

The Gross Electrical Output, at the top of the right column, is the value provided on the Overall Plant Performance parameter screen. The other values are calculated by the model as a function of the other input parameters and technologies loaded.

 