IECM 12.0 beta User Manual > A Case Study > Get Results > Base Plant > Capital Cost |
|
Click the third screen in the 1. Boiler process type, Capital Cost. This screen displays tables for the direct and indirect capital costs related to the boiler. The screen looks like this:
GET RESULTS: Base Plant: 1. Boiler: Capital Cost
The cost year is displayed on the right side of the Status Bar along the bottom edge of the window. Since we didn't change it, the default is used, currently Constant 2020 Dollars. You may change this and related financial parameters on the SET PARAMETERS: Overall Plant: Financing & Cost Year parameter screen if needed.
Totals are highlighted in yellow.