IECM 13.0 User Manual
IECM 13.0 User Manual

IECM 13.0 User Manual > A Case Study > Get Results > Base Plant >

O&M Cost

 

← Previous | Next → 

 

Click the fourth screen in the 1. Boiler process type, O&M Cost. This screen displays tables for the variable and fixed O&M costs involved with the boiler. It looks like this:


GET RESULTS: Base Plant: 1. Boiler: O&M Cost

As with Capital Cost, the cost year may be found on the right side of the Status Bar. Totals are highlighted in yellow.

 


Copyright © 2022-2025 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/