IECM 12.0 beta User Manual > A Case Study > Get Results > Base Plant > O&M Cost |
|
Click the fourth screen in the 1. Boiler process type, O&M Cost. This screen displays tables for the variable and fixed O&M costs involved with the boiler. It looks like this:
GET RESULTS: Base Plant: 1. Boiler: O&M Cost
As with Capital Cost, the cost year may be found on the right side of the Status Bar. Totals are highlighted in yellow.
Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/