IECM 12.0 beta User Manual
IECM 12.0 beta User Manual

IECM 12.0 beta User Manual > Using the IECM > Getting Results > Table Screens >

Units

 

← Previous | Next → 

 

The Result Time Period selected in CONFIGURE PLANT: Unit Systems affects performance tables as well as diagrams.
 

There are also two settings on that screen which specifically apply to tables: Performance Table and Cost Table. There are a few tables, e.g., GET RESULTS: Overall Plant: Cost Summary that override these settings; however, most tables will follow them.


Copyright © 2023-2024 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/