The Pre-injection Cost screen shows the pre-injection costs associated with the CO2 storage system for all plant types in a single table format . The following costs are shown:

Site Evaluation: This is the cost of regional evaluation.

Site Characterization: This is the cost of site characterization.

Permitting: This is the cost of permitting.

Miscellaneous Capital Cost: This covers costs not included above.

Total Capital Requirement (TCR): Money that is placed (capitalized) on the books of the utility on the service date. TCR includes all the items above. This result is highlighted in yellow.

Effective TCR: The TCR that is used in determining the total power plant cost. The effective TCR is determined by the % TCR Amortized, which is specified on the Pre-injection Cost parameter screen . This result is highlighted in yellow.