IECM 14.0 beta User Manual > Modules Included with the IECM > Low-Carbon Hydrogen Production & Transport > GET RESULTS > Overall Plant > Capital Cost (BEC) |
|
The capital costs are divided into three screens. The first screen, Capital Cost (BEC), displays the Bare Erected Cost (BEC) results for the entire plant in a single-table format. Each row corresponds to a technology:
•Reforming Area: Natural Gas Reforming
•Syngas Cleanup: Water Gas Shift reaction and CO2 carbon capture for syngas
•Post-Combustion Carbon Capture: CO2 carbon capture for flue gas
•Hydrogen Purification: H2 purification using pressure swing adsorption
•Water System: A system for delivering the water for processing, makeup, and cooling
•Bare Erected Cost: The total of all technologies listed above. This result is highlighted in yellow.