IECM 14.0 beta User Manual
IECM 14.0 beta User Manual

 

The capital costs are divided into three screens. The second screen, Capital Cost (TPC), displays the Total Plant Cost (TPC) results for the entire plant, as described in Hydrogen Production Capital Cost (TPC).


Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/