The Cost Summary result screen displays a single-table showing the costs associated with the hydrogen production plant as a whole. The costs summarized on this screen are expressed in constant dollars for a specified year, as shown in the Status Bar. The following costs are shown:
•Capital Cost: This is the total capital cost for the entire plant.
•Non-Fuel VOM Cost: This is the non-fuel variable O&M cost for the entire plant.
•Fixed O&M Cost: This is the fixed O&M cost for the entire plant.
•Fuel Cost: This is the total fuel cost for the entire plant.
•Total Cost: This is the total of all components listed above. It is highlighted in yellow.
•45Q Tax Credit: This is the total 45Q tax credit claimed for the entire plant.
•Total Cost w/ Tax Credit: This is the total cost, minus the total amount of tax credits applied for the entire plant. It is highlighted in yellow.