IECM 14.0 beta User Manual
IECM 14.0 beta User Manual

 

The Fixed O&M Cost screen shows the fixed O&M costs for the entire plant in a single-table format:

•Annual Operating Labor: Operating labor cost is based on the base wage rate, the number of operators per shift required to operate the plant per eight-hour shift, and the operating labor burden rate.

•Maintenance Labor: This parameter is estimated as a percentage of the TPC. See SET PARAMETERS: Overall Plant: O&M Cost for details.

•Maintenance Material: This parameter is estimated as a percentage of the TPC. See SET PARAMETERS: Overall Plant: O&M Cost for details.

•Administration & Support Labor: This parameter is estimated as a percentage of the Operating & Maintenance Labor aht the labor overhead charge. See SET PARAMETERS: Overall Plant: O&M Cost for details.

•Property Taxes & Insurance: This parameter is estimated as a percentage of the TPC. See SET PARAMETERS: Overall Plant: O&M Cost for details.

•Total Fixed O&M Cost: This is the total of all components listed above. It is highlighted in yellow.


Copyright © 2022-2026 University of Wyoming. All rights reserved. Visit us at https://www.iecm-online.com/