IECM 14.0 beta User Manual > Modules Included with the IECM > Low-Carbon Hydrogen Production & Transport > GET RESULTS > Overall Plant > Variable O&M Cost |
|
The Variable O&M Cost screen shows the variable O&M costs for the entire plant in a single-table format:
•Chemicals & Catalysts: This is the chemical and catalyst cost for the entire plant.
•Water: This is the water cost for the entire plant. This includes the water recycling credit from the syngas cleanup and flue gas capture areas.
•Electricity: This is the electricity cost for the entire plant.
•Waste Disposal: This is the waste disposal cost for the entire plant.
•CO2 T&S: This is the CO2 transport and storage cost for the captured CO2.
•Total Non-Fuel VOM Cost: This is the total of all components listed above. It is highlighted in yellow.
•Fuel Cost: This is the natural gas cost for the entire plant.
•Total VOM Cost: This is the total of the Non-Fuel VOM and the Fuel cost. It is highlighted in yellow.