Some of the content on this website requires JavaScript to be enabled in your web browser to function as intended. While the website is still usable without JavaScript, it should be enabled to enjoy the full interactive experience.

Skip to Main Navigation. Each navigation link will open a list of sub navigation links.

Skip to Main Content

Facilities Planning Office|Division of Administration

Contact Us

Facilities Planning Office
1000 E. University Ave., Dept 3413
Merica Hall 211
Laramie, WY 82071
Phone: 307-766-2250
Fax: 307-766-2255
Email: Facilitiesplan@uwyo.edu

REQUEST FOR CONSTRUCTION MANAGER-AT-RISK QUALIFICATIONS

UNIVERSITY OF WYOMING

 

The University of Wyoming invites your response to this request for qualifications to provide Construction Manager At-Risk (CMAR) services to build a new HIGH BAY RESEARCH FACILITY. Your response shall be on the forms or format provided by the University of Wyoming. Requests for project information and qualification forms shall be directed to: Matt Newman, Associate Director, Facilities Planning Office, 1000 E. University Ave., Dept. 3413, University of Wyoming, Laramie, Wyoming 82071. Phone: 307-766-2250 or Fax: 307-766-2255.

The High Bay Research Facility will be a flexibly-configured laboratory building, designed and built to accommodate large-scale experiment configurations in a semi-industrial setting and to provide infrastructure necessary for future expansion in a modular fashion. Other parts of the facility will be designed to house smaller-sized laboratories, offices (walled and open spaces), and conference rooms. The flexible laboratories will consider state-of-the-art energy-efficient heating and ventilating systems with a defined capacity; plumbing with appropriate sand, oil, and similar traps; compressed air; expandable electrical service; and networking (fiber optic) connectivity. Laboratory spaces will be comprised of both traditional and high bay (high ceiling) spaces to accommodate varying and evolving future research needs.  Typically, the laboratories will be outfitted at the cost of the research project.

This commission will be awarded to a firm with the qualifications best suited for this University

capital project and the best interests of the University of Wyoming with Wyoming residency being a

consideration. The agreement to be used with this commission will be the Agreement Between

Construction Manager At-Risk and the University of Wyoming Board of Trustees. The Agreement

is not a professional society standard agreement.

Completed University qualification forms shall be received In the Facilities Planning Office identified above by 3:00 p.m. MDT, May 6, 2014. Provide 3 hard copies and 1 electronic copy of your response.

Laurence Blake, AIA

Interim Director, Facilities Planning

University of Wyoming

 Dated: April 11, 2014

Publish: April 15, 22 & 29, 2014

Share This Page:

Footer Navigation

University of Wyoming Medallion
 
1000 E. University Ave. Laramie, WY 82071 // UW Operators (307) 766-1121 // Contact Us // Download Adobe Reader