Some of the content on this website requires JavaScript to be enabled in your web browser to function as intended. While the website is still usable without JavaScript, it should be enabled to enjoy the full interactive experience.

Skip to Main Content

News

Contact Us

University Public Relations - Institutional Communications
Chad Baldwin
Room 137, Bureau of Mines Building, Laramie, WY 82071
Phone: (307) 766-2929
Email: cbaldwin@uwyo.edu

Groundbreaking March 8 for Enzi STEM Facility at UW


February 27, 2013 — University of Wyoming and state elected officials will break ground Friday, March 8, for a new undergraduate laboratory facility in the science, technology, engineering and mathematics fields.

The ceremony to launch construction of the Michael B. Enzi STEM Facility is set for 1:30 p.m. at the site of the project, located north of Lewis Street between 10th and 11th streets on the north side of UW’s campus.

U.S. Sen. Mike Enzi, R-Wyo., for whom the building is named, will be among those turning ceremonial shovelfuls of dirt. The state’s senior senator will be joined as speaker during the event by Gov. Matt Mead, UW Board of Trustees President Dave Bostrom and UW President Tom Buchanan.

The public is invited to the groundbreaking ceremony.

The Michael B. Enzi STEM Facility is for teaching laboratories for introductory courses such as general chemistry, general biology, organic chemistry, elementary physics, mathematics, computational sciences, computer science and other large-enrollment lab courses. The nearly 100,000-square-foot facility will house about 32 laboratories, eight preparatory rooms and eight offices. It will not house research laboratories.

The new laboratory spaces will replace existing facilities on campus, many of which are outdated. For example, botany laboratories were last remodeled in the 1950s, while zoology and physiology, chemistry and physics laboratories remain essentially the same as when built nearly 45 years ago.

The new facility also will include a laboratory for a new UW undergraduate atmospheric sciences program that will interface with the NCAR-Wyoming Supercomputing Center in Cheyenne.

Funding for the new building was made available through a 2011 Wyoming legislative appropriation of $50 million in federal Abandoned Mine Lands dollars. The project is being administered by the office of Construction Management in the Wyoming Department of Administration and Information.

Completion is scheduled for spring 2015.

This architect’s rendering shows what the University of Wyoming’s Michael B. Enzi STEM Facility will look like.

Share This Page:

Footer Navigation

University of Wyoming
 
1000 E. University Ave. Laramie, WY 82071 // UW Operators (307) 766-1121 // Contact Us