Skip to Main Content

Apply Now to the University of Wyoming apply now
Menu
Contact Us

Dr. Charlie Zhang

EN 3099

1000 E. University Ave

Laramie, WY 82071

Phone: (307)766-4232

Email: chengyi.zhang@uwyo.edu

publications

Selected Journal Publications:

  • Arias, S., Li, H., Zhang, C.*, & Jiang, A. (2021). Predictive analytics on engineer manual 385 effectiveness of reducing number and severity of mishaps. Canadian Journal of Civil Engineering. 10.1139/cjce-2020-0319.
  • Li, H., Wang, F., Wang, L., Su, L., Zhang, C., & Wu, G. (2020). The Stochastic Evolution Game of Knowledge Sharing in the Infrastructure PPP Supply Chain Network. Complexity, 2020, 8858845.
  • Zhang, C., & Arditi, D. (2020). Advanced Progress Control of Infrastructure Construction Projects Using Terrestrial Laser Scanning Technology. Infrastructures, 5(10).
  • Li, Y., li, H., Liu, Z., & Zhang, C. (2020). Critical Factors to Achieve Sustainability of Public-Private Partnership Projects in the Water Sector: A Stakeholder-Oriented Network Perspective. Complexity.
  • Li, H., Zhang, C.*, Song, S., Demirkesen, S., & Chang, R. (2020). Improving Tolerance Control on Modular Construction Project with 3D Laser Scanning and BIM: A Case Study of Removable Floodwall Project. Applied Sciences, 10(23), 8680.
  • Jiang, A., Liu, X., Czarnecki, E., & Zhang, C. (2019). Hourly weather data projection due to climate change for impact assessment on building and infrastructure. Sustainable Cities And Society, 50.
  • Wang, W., & Zhang, C. (2018). Evaluation of relative technological innovation capability: Model and case study for China’s coal mine. Resources Policy, 58, 144–149.
  • Guo, L., Li, H., Li, P., & Zhang, C. (2016). Transaction costs in construction projects under uncertainty. Kybernetes, 45(6), 866–883.
  • Kalasapudi, V. S., Tang, P., Zhang, C., Diosdado, J., & Ganapathy, R. (2015). Adaptive 3D Imaging and Tolerance Analysis of Prefabricated Components for Accelerated Construction. Defining The Future Of Sustainability And Resilience In Design, Engineering and Construction, 118, 1060–1067.
  • Zhang, C., & Arditi, D. (2013). Automated progress control using laser scanning technology. Automation In Construction, 36, 108–116.
  • Zhang, C., Arditi, D., & Chen, Z. (2013). Using Terrestrial Laser Scanners To Calculate And Map Vertical Bridge Clearance. ISPRS 8th 3d Geoinfo Conference & Wg Ii/2 Workshop, 40-2-W2, 133–138.
  • Zhang, C., Arditi, D., & Chen, Z. (2013). Documentation And Visualization Of An As-Built Tunnel By Combining 3d Laser Scanning And Web Mapping. ISPRS 8th 3d Geoinfo Conference & Wg Ii/2 Workshop, 40-2-W2, 139–144.

Selected Conference Publication

  • 2020 Michael Olen, Chang-Ray Chen, Chengyi Zhang (corresponding author), Bryan Dyer (2020), A Case Study of Reducing the Costs of Deconstructing Blighted Buildings in the City of Milwaukee, Proceedings of Associated Schools of Construction Region 3 Conference, Downers Grove, IL, October 2020
  • 2020 Huimin Li, Chengyi Zhang (corresponding author), Siyuan Song, Sevilay Demirkesen (2020), A Framework for Automatic Tolerance Analysis of Removable Flood Wall Anchor Plates With 3D Laser Scanning and BIM, 6th International Project and Construction Management Conference, November 2020. (Accept for publication)
  • 2020 Sevilay Demirkesen and Chengyi Zhang (2020), Designing Out Errors: Application of Lean TRIZ Method to Safety Related Problems in the Construction Industry. 6th International Project and Construction Management Conference, November 2020. (Accept for publication)
  • 2019 Arias, S., Li, H., and Zhang, C.(2019) Engineer Manual 385 Effectiveness: A Study of Predictive Analytics, 2019 Associated Schools of Construction National Conference Proceeding, Denver, April 2019
  • 2017 McCarty, R. D., Zhang, C., Dyer, B. D., and Arias, S. (2017) Assessing the feasibility of using UAV in surveying for small business in Kentucky, 2017 ASC Region III conference proceedings, Downers Grove, IL.
  • 2016 Li, H., and Zhang, C. (2016) The comparison of Influence Path of Transaction Costs in Construction Projects, Interaction between Theory and Practice in Civil Engineering and Construction. ISBN 978-0-9960437-2-4, 1st European and Mediterranean Structural Engineering and Construction Conference, Istanbul, Turkey, May 24-29, 2016.
  • 2009 Wang, W., Kong, Y., and Zhang, C. (2009). (Ed.), Study on System Integration Model Based on Multi-Agent System for Coal Enterprise, rank: A. International Conference on Management and Service Science, 2009.
  • 2008 Wang, W. Zhao, Y. & Zhang, C. (2008). Study on Risk Management of Management Information System Software Project, rank: A. Proceedings of The International Conference on Management of Technology, Taiyuan, China, 2008.
  • 2008 Wang, W., and Zhang, C. (2008). In Guoping Xia, Hirokazu Osaki (Ed.), Study on Production Plan Optimization Model Based on BP-MOP in Coal Enterprise, rank: A. Proceedings of the Ninth International Conference on Industrial Management, September 16-18, 2008, Osaka, Japan

Contact Us

Dr. Charlie Zhang

EN 3099

1000 E. University Ave

Laramie, WY 82071

Phone: (307)766-4232

Email: chengyi.zhang@uwyo.edu

1000 E. University Ave. Laramie, WY 82071
UW Operators (307) 766-1121 | Contact Us | Download Adobe Reader

Accreditation | Virtual Tour | Emergency Preparedness | Employment at UW | Privacy Policy | Harassment & Discrimination | Accessibility Accessibility information icon