Some of the content on this website requires JavaScript to be enabled in your web browser to function as intended. While the website is still usable without JavaScript, it should be enabled to enjoy the full interactive experience.

Skip to Main Navigation. Each navigation link will open a list of sub navigation links.

Skip to Main Content

News

Subcontractors and Vendors Encouraged to Meet with HPG-ATC Design-Build Contractors


March 14, 2011 —  Subcontractors and vendors from Wyoming and the region are invited to meet Wednesday, March 23, with the two contractors who were pre-qualified to bid on the High Plains Gasification-Advanced Technology Center (HPG-ATC).

The meeting will be from 4-6 p.m. at the Arundel Building, 7052 Commerce Circle in the Cheyenne Business Parkway. Subcontractors and vendors are encouraged to bring business cards, brochures and other information to exchange with representatives from Worley-Parsons and Burns & McDonnell. Please wait in the lobby until invited into the meeting.

GE Energy and University of Wyoming representatives will not attend.

The HPG-ATC is expected to consist of a small-scale gasification system that would allow UW and GE Energy researchers to develop and validate advanced coal gasification technology solutions for Powder River Basin and other Wyoming coals. The plant is expected to allow engineers to gain experience in advanced coal gasification processes including the uses of synthesis gas that is produced by the gasification process. It also will provide students an opportunity to learn about coal gasification.

For more information about the HPG-ATC, visit the official Web site at www.uwyo.edu/hpg-atc .

Share This Page:

Footer Navigation

University of Wyoming Medallion
 
1000 E. University Ave. Laramie, WY 82071 // UW Operators (307) 766-1121 // Contact Us // Download Adobe Reader