Construction Report

UW Operations

Construction Report for February 22 - February 28, 2020

 

Colder Weather Advisory (UW Operations) - UW Operations asks building occupants to assist with ensuring buildings and facilities are safe and secure. Make sure all windows and doors are completely closed with windows latched at the end of each day, and report any doors or windows that you are unable to close and secure to the Service Desk (766-6225).

Campus Snow Removal (UW Operations) - Crews will remove snow as needed throughout the season. Watch for snow-removal equipment; be careful and safe during snow events. Call the Service Desk (766-6225) to report icy spots and problem areas.


Buchanan Center for Performing Arts (UW Operations/Fremont Electric, Ongoing) – Corridor lighting fixtures are being replaced with LED in portions of the BCPA. (Energy efficient upgrade)

College of Business (UW Operations) – Maintenance painting throughout the College of Business will occur throughout the next few months.

Cheney International Center/Student Health (The Plumbing Company, Big Huhnks Excavation) – Excavation to occur near the southeast corner of the Cheney International Center/Student Health building to locate chilled water lines in the area. Please use caution near crews and equipment.

General Storage (Gem City Roofing April 1, 2020) – Gem City Roofing will be re-roofing sections of the General storage building this winter. Please keep clear of all equipment and out of barricaded areas. Please note: Parking areas may be closed for short periods.

Engineering (UW Operations, Colorado Hazard Control, Voltech Electric; Fall 2020) – Renovation of the offices along the southern end of the 1925 portion of the Engineering building are ongoing. Remodel efforts are expected to continue until the Fall 2020 semester. Please use caution near the crews and equipment.

Engineering (Big Horn Roofing April 3, 2020) – Big Horn Roofing will be re-roofing the Engineering building (80s addition) this winter. Please keep clear of all equipment and out of barricaded areas. Please note that parking areas and driveways next to the Engineering building will be closed for short periods. Please be advised there will be Re-Roofing Odors thru-out the building at times. Operations has installed carbon pre-filters to help fight the odors.

Orr Hall Water Main Break (The Plumbing Company & Big Hunks Excavating) - Will be making repairs to the S.E. corner of Orr Hall, work starting on 02/06/20 is expected to last several weeks until concrete is all repaired and cured. Please use caution around this area with trucks and heavy equipment and excuse our mess.

Ross Hall (Colorado Hazard Control) – Ross Hall is currently undergoing floor repairs, cleaning, waxing, abatement and flooring replacements on first, second and third floors. Please be cautious in these areas.

Science Initiative Building (SI) (Construction manager GE Johnson Construction Wyoming LLC, Jackson; Spring 2022) – Excavation and foundation activities are in process. Please continue to observe all restricted areas, and traffic control provisions. The north half of Lewis St. between 9th and 10th St. will be closed for the duration of the project for construction staging and field offices.

Contact Us

UW Operations

1000 E. University Avenue

Dept. 3227

Laramie, WY 82071

Phone: (307) 766-6225

Fax: (307) 766-4040

Email: svsdesk@uwyo.edu

1000 E. University Ave. Laramie, WY 82071
UW Operators (307) 766-1121 | Contact Us | Download Adobe Reader

Accreditation | Virtual Tour | Emergency Preparedness | Employment at UW | Privacy Policy | Harassment & Discrimination | Accessibility Accessibility information icon