Lewis St. Corridor Phase 1

Phase 1 of the Lewis Street Corridor follows the vision defined in the Lewis Street Master Plan adopted in 2019. The plan establishes the framework for converting the existing Lewis Street vehicular roadway to a meaningful pedestrian corridor through the north side of campus. The Corridor will extend the character of Prexy’s Pasture onto the north side of campus tying together the diverse architectural styles creating a cohesive, pleasing, and functional pedestrian and bicycle experience. The plan was created in conjunction with the Campus Master Plan.

The project includes a significant utility relocation and coordination with the installation of heating and cooling lines routed from the new West Campus Satellite Energy Plant to Prexy’s Pasture.

Rendering of the Lewis Street Corridor

Contractor: GE Johnson Construction, Jackson WY 
Architect: Norris Design   

Construction Schedule:

  • Phase 1 Construction Start: Spring 2021

  • Phase 1 Construction Complete: Fall 2022

Project Size: 5 acres

Project Budget: $5,000,000

Project History:

Campus Impacts:

  • 12th Street between Lewis and Bradley Streets will be permanently closed to private vehicles beginning in the summer of 2022.